Campbells Creek Missing Link Pedestrian Bridges

Client: Mount Alexander Shire Council $1.3million Construction of new gravel shared use path to connect existing paths from Campbells Creek to Castlemaine In-situ construction of two new concrete bridges through Campbells Creek environmentally sensitive corridor with minimal tree removals and restricted access

Craigieburn Zone Substation

Client: Zinfra / Jemena $4million Construction of new zone substation for Craigieburn Data Centre power supply Acting as Head Contractor works involved bulk earthworks, deep reinstatement of existing unsuitable subgrade, piled footings, concrete structures, utility service connections, building installations, and tilt up blast wall erection.

Geach Street Road Upgrade

Client: City of Hume $2.2million Reconstruction of full length of Geach Street in Dallas, Victoria. Included installation of 525mm diameter deep drainage beneath multiple buried services, and facilitation of pedestrian and resident access to the street during construction works.

Para Road Shared Use Path

Client: City of Banyule $1million Construction of new shared use path along Para Road in Greensborough including construction of new gabion basket retaining walls and relocation of PTV bus bay under traffic management in narrow corridor between arterial roadway and metro railway lines.

McIvor Highway Traffic Signals Bendigo

Client: Department of Transport and Planning $1million Construction of new signalised pedestrian crossing at intersection of McIvor Highway, Chapel Street, and Hargreaves Street in Bendigo. Required careful planning and stakeholder interfacing to ensure continuous emergency vehicle access into Fire Rescue Victoria depot on corner of worksite. Required careful staging of works and nightshift to mitigate […]

Black Rock Inlet Modifications

Client: Barwon Asset Solutions $3million Live diversion of existing Geelong Main Outfall Sewer at the Black Rock treatment plant to perform detailed sewer remediation and upgrade works. Works required careful planning of bypass pumping operations, and research of PVC welding and Concrete Protection Liner repair procedures for scope of works.

Plenty Road Gas Relocation

Client: APA / Downer Gas 2021 $1million Brownfield construction of 180 – 280mm PE gasmain to enable widening of Plenty RoadCoordination of works with Downer Gas PE weldingcrewCoordination of works with Decmil to create safework methodologies and facilitate traffic volumes onPlenty Road during worksCoordination with Downer Gas and APA to devisesafe lifting and installation methodology […]

Altona Prixcar

Client: Alchemy / Charter Hall May – September 2022 $1.2million Demolition, stabilization and reinstatement ofexisting 7,600sq.m crushed rock hardstandConstruction of new 7,600sq.m concretehardstandRemediation and refurbishment of existing2,000sq.m carparkStage works to enable ongoing operation ofPrixcar logistics facility

Integrated Recreation Facilities in Truganina and Tarneit

Client: CICG / City of Wyndham Jan 2021 – August 2022 $2.7million Completion of topsoil strip and bulkearthworks 20,000cu.m of fill and13,000cu.m of cutConstruction of building pads and sportingovalsConstruction of 11,500sq.m carparkConstruction of 9,000sq.m of footpathsincluding stairs and retaining wallsConstruction of 1.5km of drainage inbasalt rock March 2021 – July 2022 $1.3million Completion of topsoil […]

Renewal of the Glenferrie Road Bridge

Client: SRG / Department of Transport& Planning Jan – May 2023 $1million Staged demolition of existing bridge structureover live rail while maintaining traffic flow Steel fixing and concrete works forstaged construction of new bridge deckFinal stage performed under ten-daytram rail occupation to mitigate publictransport impacts